CRM tender terminology explained simply
Mon Projet CRM - 12 septembre 2024
Preparing a CRM tender involves navigating technical vocabulary that can sometimes be opaque to non-specialists. RFP, RFI, RFQ, POC, SLA, TCO, MSA... these acronyms actually represent very concrete documents and concepts that structure the dialogue with vendors and integrators. Understanding them better allows you to ask the right questions, avoid misunderstandings, and compare the proposals received more effectively. This practical glossary covers the main terms you will encounter throughout your project.
Tender documents and stages
Several types of documents structure the process, to be used depending on the maturity of the requirement:
- RFI (Request for Information): a request for information sent to several vendors to explore the market and identify potential solutions.
- RFP (Request for Proposal): a formal call for proposals, based on detailed specifications.
- RFQ (Request for Quotation): a request for pricing, usually following a pre-selection of suppliers.
- Specifications (Cahier des charges): the reference document formalising the context, scope, functional and technical requirements.
- Scorecard: a tool for structured comparison of responses based on weighted criteria.
- Shortlist: a restricted selection of vendors retained for the second phase (demonstrations, workshops).
Selection and testing terminology
During the selection phase, several concepts frequently arise:
- POC (Proof of Concept): a mock-up or prototype that validates the feasibility of a key use case before committing.
- Pilot: a restricted deployment to a limited scope (team, branch, functional scope) before full roll-out.
- Customised demonstration: a product presentation tailored to your real-world use cases.
- Customer reference: a comparable company that the vendor or integrator can cite as a testimonial.
Contractual and financial terms
When moving to contract, these terms are essential:
- SLA (Service Level Agreement): service level commitment (availability, support response times, etc.).
- MSA (Master Service Agreement): a framework contract setting out the general terms of the relationship.
- TCO (Total Cost of Ownership): the total cost of a solution over several years, including licences, integration, training, and operations.
- Exit management / Reversibility: the ability to recover your data and switch providers under sound conditions.
- Roadmap: the vendor's product development plan, outlining upcoming features.
Common technical terms
On the technical side, some key terms:
- SaaS (Software as a Service): software hosted by the vendor and accessed via the Internet.
- On-premise: software installed on the company's own servers.
- API: an interface that allows two software programmes to exchange data.
- Integration / connector: the technical link between the CRM and another tool (ERP, marketing, telephony).
- GDPR: European regulation on personal data protection, to be integrated from the scoping phase.
Common mistakes
Typical areas of confusion:
- Confusing RFI and RFP and launching a tender before the requirement is fully qualified.
- Comparing proposals based on licence price alone without looking at the TCO.
- Neglecting exit management clauses at the time of signing.
- Underestimating the importance of SLAs, especially regarding support and availability.
Questions to ask yourself
Before sending out a tender:
- Do we need an exploratory RFI or a structured RFP?
- Do our specifications describe business processes or just features?
- Have we prepared a shared scorecard?
- Are we clear on the SLAs we require?
Further reading
To go further, see our articles on preparing a CRM tender dossier, the stages of a tender process, and the role of stakeholders.
Key takeaways
- RFI, RFP, and RFQ correspond to different stages of maturity in a tender process.
- POCs and pilots allow for testing before making a full commitment.
- SLA, MSA, TCO, and reversibility are at the heart of contract negotiations.
- SaaS and On-Premise refer to two very different deployment models.
- Mastering this vocabulary facilitates dialogue with software vendors and integrators.
Want to go further?
Discover our tools, checklists and templates to apply these recommendations immediately.